Government
of
Department of Industries & Commerce
NOTIFICATION
Dated:
29th May, 2003
No. 5/58/2002/IIB/1506 : Whereas, with a view to facilitate the development
of Industry in the State, Government of Punjab have notified the “Industrial
Policy – 2003” vide No. 5/58/2002/IIB/968 dated 26.3.2003, which inter-alias
provides for Certification of Weights & Measures under the Weights &
Measures (Enforcement) Act, 1985 by Chartered Engineers.
Now, therefore, to implement the scheme of Certification of Weights &
Measures under the Weights & Measures (Enforcement) Act, 1985 by Chartered
Engineers, set out in the aforesaid policy, the Governor of Punjab is pleased
to notify detailed scheme as under:-
1. INTRODUCTION
The State Government
has introduced a scheme of certification for verification and stamping of
weights and measures under the Standards of Weights & Measures (Enforcement)
Act 1985 by conferring powers of inspectors under section-5 (1) of the said
Act to the Chartered Engineers possessing requisite qualifications, who shall
exercise such powers and discharge such functions of Inspectors conferred
or imposed on them by or under this Act in accordance with this scheme.
2. SCOPE
3. QUALIFICATIONS OF CHARTERED ENGINEER
The Chartered Engineers to be authorised
under this scheme shall have the following qualifications:-
* Degree
in Engineering from a recognised university.
* He
should be registered with Indian Institution of Engineers.
* He
should be of sound mind and of good physical health.
4. PROCEDURE FOR AUTHORISATION OF CHARTERED ENGINEER
(i) Chartered Engineers fulfilling the qualification
as per Clause-3 above and desirous of discharging such functions may apply
in response to an advertisement to the Controller Weights & Measures,
Punjab in Format WM-I along with documents listed therein.
(ii) A
seniority list in terms of qualifications and experience from the complete
applications received above will be prepared by the office of Controller,
Weights & Measures. Controller, Weights & Measures,
(iii) In
case of any irregularity, authorisation of Chartered Engineer shall be terminated
by Controller Weights & Measures,
5. STATUS
The Chartered Engineers
will be authorised to exercise powers and discharge duties in accordance with Section
5 of the Act.
6. TRAINING
Every
Chartered Engineer so authorised shall have to successfully complete a two
weeks basic training course to be arranged by the Controller Weights &
Measures.
7.
JURISDICTION
The Chartered Engineers
shall operate within the State of
8. DUTIES
OF CHARTERED ENGINEERS
VERIFICATION AND STAMPING
OF WEIGHTS AND MEASURES
(i) Periodicity:
(a) Every weight or measure used or intended to be used for
industrial production shall be verified or reverified
and stamped by the Chartered Engineer once in a year, provided that storage
tanks including vats shall be reverified or recalibrated
and stamped at least once in a period of five years.
(b)Notwithstanding anything
contained above, every weight or measure which has been verified and stamped
in situ, shall, if it is dismantled and reinstalled before the date on which
the verification falls due, be duly reverified and
stamped on payment of fee as prescribed under the Rule-17 of Punjab Standards
of Weights & Measures (Enforcement) (Amendment) Rules 1999, before being
put into use.
(c) Notwithstanding anything contained above, every weight
or measure which has been verified and stamped, if it is repaired before the
date on which the verification falls due, shall be duly reverified
and stamped on payment of fees as prescribed under Rule-17 of Punjab Standards
of Weights & Measures (Enforcement) (Amendment) Rules 1999, before being
put into use.
(ii) Procedure:
(a) The Chartered Engineer
shall maintain a place designated as his office from where he shall conduct
his work, which shall be mentioned in his application and letter of authorisation.
(b)
For the purpose of verification and stamping every unit using or manufacturing
weight or measure shall present such weight or measure for verification or
reverification, as the case may be, at the office
of the Chartered Engineer, or at such other place as the latter may specify
in this behalf on or before the date on which the verification falls due.
(c) Provided that where any
weight or measure is such that it cannot, or should not be moved from its
location, the unit using or manufacturing such weight or measure shall report
to the Chartered Engineer at least 30 days in advance from the date on which
the verification falls due.
(d) Where any weight or measure is such that
it cannot or should not be moved from its location, the Chartered Engineer
shall take necessary steps for the verification of such weight or measure
at the place of its location.
(e) For the verification of weight or measure
referred to above the user or manufacturer shall provide such reasonable facilities
as may be required by the Chartered Engineer.
(f) Every weight or measure presented for verification
shall be complete in itself and shall
not bear a manufacturer’s mark, which might be mistaken for verification stamp.
(g) Every weight or measure shall be verified
in a clean condition, if necessary, the Chartered Engineer shall require the
user or manufacturer unit as the case may be, to make necessary arrangement
for the purpose.
(h) Where a weight or measure is brought to the
chartered engineer for verification or reverification,
he shall verify the same after realisation of the prescribed fee.
(iii) Stamping:
The Chartered Engineer shall stamp every weight or measure, if after verification,
he is satisfied that such weight or measure conforms to the standards established
under the Standards Act, with a stamp of uniform design issued by the Controller
against payment, which shall indicate the number allotted for administrative
purposes to the Chartered Engineer by whom it is stamped.
The
Chartered Engineer shall also mark the year and its quarter of stamping on
every verified weight or measure.
(iv) Issue of Certificate
On completion of verification
and stamping the Chartered Engineer shall issue a certificate of verification
in the form as set out at Annexure-I based on schedule-13 of Punjab Standards
of Weights & Measures (Enforcement) Rules 1993, to the unit and send a
copy of the same to the Assistant Controller Weights & Measures of the
concerned area.
The copy of the user shall
be treated as certificate of verification to be prominently displayed in the
premises of the unit in accordance with procedure laid down in Rule-23 of
Punjab Standards of Weights & Measures (Enforcement) Rule-1993.
(v) Fee for Verification and Stamping
(a) Fees payable for verification and stamping
of weights or measures at the camp office of the Chartered Engineer shall
be as specified in schedule-XIV of Punjab Standards of Weights & Measures
(Enforcement) (Amendment) Rules 1999, (Annexure-III).
(b) If, at the request of user or manufacturer
of weight or measure, verification is done at any premises other than in office
or camp office of the Chartered Engineer, an additional fees of Rs. 200 shall be charged from the user / manufacturer of weights
or measures.
Provided that no additional
fee shall be charged for verification and stamping in situ of
- Vehicle tanks,
weigh-bridges, dormant platform machines and such other weight or measure
which cannot and should not be moved from its location and
-
Weights or measure in the premises of the manufacturer of such weights or
measure.
(c) If a weight or measure is presented to the
Chartered Engineer for reverification after the
expiry of period of validity of stamp, an additional fee at half the rates
specified in Schedule-XIV Punjab Standards of Weights & Measures (Enforcement)
(Amendment) Rules 1999, shall be payable for every quarter of year or part
thereof.
(d) No fee shall be payable for restamping any weight or measure held in stock with the manufacturer
within a period specified in the Rule-14 Punjab Standards of Weights &
Measures (Enforcement) Rules 1993 from the date on which it was last stamped.
Provided that original stamp was not obliterated under
sub-section-3 of section-28 of Punjab Standards of Weights & Measures
(Enforcement) Act 1985.
(e) A weight or measure which on verification
is found to be incorrect shall be returned to the person concerned for adjustment
informing him, in a Performa as at Annexure-II, of the defects found in the
weight or measure and calling upon him to remove the defects within a period
not exceeding 7 days and when the necessary adjustment has been carried out,
such weight or measure shall be verified on payment of 50% of the fees specified
in Schedule-XIV of Punjab Standards of Weights & Measures (Enforcement)(Amendment)
Rules 1999, and if found correct, shall be stamped.
(f)
As per Rule-6 of Standards of Weights & Measures (Inter State Verification
& Stamping) Rule 1987;
(i) The fee for verification
of any weights or any measures of the first category as specified in Rule-3
of the above Rules and stamping of weight or measure with the special seal
shall be levied by the Government of the transferor State at the rate leviable in that State for verification and stamping of the
same or similar weight or measure plus an additional fee of 25% of the fee
aforesaid.
(ii) The
fee for the verification of any weight or measure of the second category as
specified in Rule-3 of the above Rules and stamping thereof shall be levied
by the Government of the transferee State at the rate leviable
in that State for the verification and stamping of the same or similar weight
or measure plus an additional fee of 25% of the fee aforesaid.
(vi) Collection of fees and deposit into treasury
(a) Before commencing the work of verification or reverification, the Chartered Engineer shall inform the unit
concerned of the fees payable by the unit as prescribed above and shall receive
the same in cash and issue a receipt in the form as placed at Annexure IV.
(b) The Chartered Engineer
shall maintain a register, in the form as at Annexure V which shall be written
on day-today basis and shall show the amount of fees and other charges collected
during the day.
(c) The Chartered Engineer shall deposit the prescribed fees
charged for verification and stamping during the fortnight with the Assistant
Controller of the Division on fortnightly basis on every alternate Monday
alongwith details of fee collected in form at Annexure
VI. Details of transportation expenditure charged, if any, shall also be submitted in the Form.
(d) The Chartered Engineer shall submit a monthly
progress report to the Controller regarding verification and stamping etc.
before 5th of every month in a Form (Annexure VII) with a copy
to concerned Assistant Controller.
9. COMPLIANCE OF ACTS AND RULES
The Chartered Engineer shall meticulously comply with the Standards of
Weights & Measures Act, 1976, the standards of Weights and Measures (Enforcement)
Act 1985 and the Rules framed there under.
10. SERVICE CHARGES
The Chartered Engineer
shall charge service charges of Rs. 200 per visit
for verification and stampings of Weights & Measures, from the unit. He
shall issue a receipt of these (including any fees charged under
11. PROVISION OF WORKING STANDARDS,
EQUIPMENTS ETC. TO CHARTERED ENGINEERS
(a) Every Chartered Engineer
shall be provided with working standards, working standard balances and such
other equipment including weighing an measuring devices
as may be approved by the Controller against payment.
(b) Every Chartered Engineer shall be provided such dies,
punches and such other equipment against payment as may be necessary for fixing
verification stamp.
(c) Every
die and punch provided to the Chartered Engineer shall be allotted a specific
code or administrative number.
(d) Every Chartered Engineer shall be
provided with punches of suitable sizes of eight- pointed star for obliterating stamps, against
payment.
12. RANDOM CHECKING
A Committee under the Chairmanship
of Director of Industries & Commerce, Punjab and comprising of General
Manager, District Industries Centre, Controller Weights & Measures and
two Representatives of local Industry Association can order random checking
(through computerised randomisation) upto 5% of
units in each district by an officer, not posted in that district and chosen
randomly. In case of defaults, the Chartered Engineer be liable to face action
as mentioned in Section 5 of the Act and the unit will be liable to be penalised
as per penal clauses defined under Chapter XI of the Act.
13.
WILFUL VERIFICATION OR DISCLOSURE IN CONTRAVENTION
OF LAW
(i) If any Chartered
Engineer exercising powers under the said Act or any rule made there under
wilfully verifies or stamps any weight or measure in contravention of the
provisions of the Act or of any rule made there under, he shall be liable
for action under section 57 (1) of the Act.
(ii) If any Chartered
Engineer who enters into any premises in the courses of his duty wilfully
discloses except in the performance of such duty, any information obtained
by him from such premises with regard to any trade secret or any secret in
relation to any manufacturing process, he shall be liable for action under
section 57 (2) of the Act.
(iii)The Chartered Engineers
under the scheme shall be liable for all acts of omission and commission,
as an Inspector is under the provisions of the relevant Act / Rules &
Regulations.
14. OVERRIDING EFFECT
The Standards Weights &
Measures (Enforcement) Act 1985 and Rules and Regulations framed there under
shall have an overriding effect on the provisions of this scheme.
15.
INTERPRETATION / RELAXATION / AMENDMENT
OF RULES
Principal Secretary, Industries & Commerce shall be competent to interpret
/ relax / amend provisions of this scheme.
S.C. Agrawal
Principal Secretary to Government,
Department of Industries & Commerce
ANNEXURE-I
VERIFICATION CERTIFICATE
I, __________________________________________________________
Chartered Engineer (Inspecting Officer) No. ___________________, hereby certify
that I have verified and stamped on _____________________, the under mentioned weights and measures belonging to __________________________________________________
locality__________________ registration number as user _________________________________________
under the Standards of Weights & Measures (Enforcement) Act, 1985.
| Quantity |
Denomination |
Weighing Instructions |
Measuring Instruments |
Verification Fee |
Carriage, conveyance, adjusting charges etc. |
||||||
| Weights |
Measures |
Capacity |
Class |
Manufact-urer |
Type |
|
Rs. |
P. |
Rs. |
P. |
|
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
||
| |
|
|
|
|
|
|
|
|
|
||
| |
|
|
|
|
|
|
|
|
|
|
|
Total Rs. _____________________ deposited vide
Treasury Receipt/Money Receipt No. ___________________ Dated_________________, the copy of the challan is enclosed herewith.
Repaired by
_________________________
(Signature)
Next Verification due on
__________________________________
Chartered Engineer
C.C.
1.
M/S. __________________________________
2.
Assistant Controller_______________________
Note:
The
certificate of verification is to be displayed in accordance with Procedure
laid down in Rule-23 of
ANNEXURE-II
To
M/S ______________________
__________________________
(User No.__________________)
Subject:
Defects in Weights & Measures.
Sir,
I have verified on _____________ the Weights & Measures belonging to you
and noted following defects in these Weights & Measures:
| Quantity |
Denomination |
Weighing Instructions |
Measuring Instruments |
Defects |
||||
| Weights |
Measures |
Capacity |
Class |
Manufacturer |
Type |
|
|
|
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
| |
|
|
|
|
|
|
|
|
You are requested to remove these defects within a period not exceeding 7
days and report for reverification and deposit 50%
of fee specified in schedule XIV under Rule 17 of Punjab Standards Weights
& Measures (Enforcement) Amendment) Rules 1999. You are also directed
not to put to use the said Weights & Measures till reverification
after necessary adjustments / repairs as it deemed to be unverified and unstamped.
Thanking You.
Yours Faithfully,
Chartered Engineer
CC:
Assistant Controller (Legal Metrology), ___________for information & necessary
action.
Note:
Full fee shall be leviable if
dispensing pump in offered for reverification after
the expiry of 7 days from date of verification mentioned above.
Annexure-III
Fee for verification of weights and measures recommended by the Central Government
for adoption by State/Union Territories for incorporation in the Schedule
XII of the Standards of the weights and Measures (Enforcement) Rules.
| Items |
Fee for each piece in rupees |
|
| 1. (a) |
Bullion Weights |
|
| 20 kg. |
20 |
|
| 10 kg. |
20 |
|
| 5 kg. |
15 |
|
| 2 kg. |
15 |
|
| 1 kg. |
15 |
|
| 500 g. |
10 |
|
| 200 g. |
10 |
|
| 100 g. |
10 |
|
| 50 g. |
10 |
|
| 20 g. |
10 |
|
| 10 g. |
10 |
|
| 5 g. |
10 |
|
| 2 g. |
10 |
|
| 1 g. |
10 |
|
| 500 mg. |
10 |
|
| 200 mg. |
10 |
|
| 100 mg. |
10 |
|
| 50 mg. |
10 |
|
| 20 mg. |
10 |
|
| 10 mg. |
10 |
|
| 5 mg. |
10 |
|
| 2 mg. |
10 |
|
| 1 mg. |
10 |
|
| (b) |
Brass Weights (Other
than Bullion) 1 kg. 500 g. 200 g. 100 g. 50 g. 20
g. 10 g. 5 g. 2 g. 1 g. |
5 3 3 3 3 3 3 3 3 3 |
| (c) |
Sheet Metal Weights (Other
than Bullion) 500 mg. 200 mg. 100 mg. 50 mg. 20 mg. 10 mg. 5 mg. 2 mg. 1 mg. |
3 3 3 3 3 3 3 3 3 |
| (d) |
Iron and Steel Weights 50 kg. 20 kg. 10 kg. 5 kg. 2 kg. 1 kg. 500 g. 200 g. 100 g. 50 g. |
10 10 10 10 10 10 3 3 3 3 |
| (e) |
Carat Weights 500 c. 200 c. 100 c. 50 c. 20 c. 10 c. 5 c 2 c 1 c 50/100 c 20/ 100 c 10/100 c 5/100 c 2/100 c 1/100 c 0.5/100 c |
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 |
| 2. |
Capacity Measure 100 1 and above 50 l 20 l 10 l 5 l 2 l 1 l 500 ml 200 ml 100 ml 50 ml 20 ml 10 ml 5 ml 2 ml 1 ml 18.5 l |
Rs. 20 for the 1st 100 litre.
Plus Rs. 5 for every additional 100 litre
or part hereof subject to maximum of 5000. 20 10 10 5 5 5 5 5 5 5 5 3 3 3 3 Omit |
| 3. |
Length measures (a) Non-flexible 2
m 1
m 0.5
m 1 m graduated at every cm 0.5 m graduated at every cm (b) Fabric plastic. 10 m and above 5
m 3 m 2 m 1.5 m 1 m 0.5 m (c) Woven 50 m 30 m 20 m 15 m 10 m 5 m 2 m |
5 5 5 10 10 Rs. 6 for the 1st 10 meters.
Plus Rs. 2 for every additional 5 metres. 5 5 5 5 5 5 Rs. 10 for the 1st 10 metres.
Plus Rs. 5 for additional 5 metres. Ditto Ditto Ditto Ditto 5 5 |
| |
(d) Steel Tapes 50 m 30 m 20 m 10 m 5 m 4 m 3 m 2 m 1.5 m 1.0 m 0.5 m |
Rs. 10 for 1st 10 metres.
Plus Rs. 5 for every additional 5 metres. Ditto Ditto Ditto 5 5 5 5 5 5 5 |
| (e) Folding Scales 1 m 0.5 m |
5 5 |
|
| (f) Surveying Chain 30 m 20 m |
30 30 |
|
|
4. |
Non-Automatic weighing instruments
Mechanical League Indication belonging to ordinary any medium accuracy
class. |
|
| |
400 t 300 t 200 t 150 t 100 t 80 t 60 t 50 t 40 t 30 t 25 t 20 t 15 t 10 t 5 t 3 t 2 t 1500 kg 1000 kg 500 kg 300 kg 250 kg 200 kg 150 kg 100 kg 50 kg 30 kg 25 kg 20 kg 15 kg 10 kg 5 kg 3 kg 2 kg 1 kg 500 g and below Person weighing Machine excluding
both room scales. |
2000 1500 1500 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 500 250 200 200 150 150 150 100 100 50 50 50 50 50 30 30 20 20 20 20 20 20 10 50 |
| 5. |
Beam Scales Class A & B 200 kg 100 kg 50 kg 20 kg 10 kg 5 kg 2 kg 1 kg 500 g and below |
200 150 120 120 100 80 80 80 50 |
| 6. |
Beam Scale Class C & D 1000 kg 500 kg 300 kg 200 kg 100 kg 50 kg 20 kg 10 kg 5 kg 2 kg 1 kg 500 g and below |
100 100 100 50 50 15 15 15 10 10 10 5 |
| 7. |
Weighing instrument of High Accuracy
class and Special Accuracy both Mechanical and Electronic: Exceeding 50 t |
1500 |
| Not exceeding 50 t But exceeding 10 t |
1000 |
|
| Not exceeding 10 t But exceeding 1 t |
500 |
|
| Not exceeding 1 t But exceeding 50 kg |
300 |
|
| Not exceeding 50 kg But exceeding 10 kg |
200 |
|
| Not exceeding 10 kg |
120 |
|
| 8. |
Automatic Weighing Machine: Exceeding 10 t |
1000 |
| Not exceeding 10 t But exceeding 1 t |
500 |
|
| Not exceed 1 t But exceed 50 kg |
250 |
|
| Not exceed 50 kg But exceed 10 kg |
150 |
|
| Not exceed 10 kg |
100 |
|
| 9. |
Totalizing Machine: (a) Independent Machine (b) As additional machine |
1000 500 |
| 10. |
Volumetric Measuring Instrument: (a) Dispensing pumps; each pump (b) Totalizing counters (c) Other instruments exceeding 100 liters |
500 250 Rs. 250 for the 1st 100
liters plus 150 for every additional 100 liters or part thereof subject to a maximum of Rs. 5000 |
| Not exceed 100 l But exceed 50 liter |
200 |
|
| Not exceed 50 liter But exceed 20 liter |
150 |
|
| Not exceed 20 liter |
100 |
|
| 11. |
Flow Metres: Flow rate upto 100 litre/min. |
1000 |
| Above 100 litre But upto
500 litre/min. |
2000 |
|
| Above 500 l/min. |
5000 |
|
| 12. |
Linear Measuring Instrument: Taxi/Auto-rickshaw Metres Other meters |
50 Rs. 25 for the 1st 1000m.
plus Rs. 5 for every additional 100 m or part
thereof subject to maximum of Rs. 150 |
| 13. |
Clinical Thermometer |
2 |
| 14. |
Water Meter |
25 |
| 15. |
Electricity Meter |
Omit |
| 16. |
Kitchen scales: 500 g 1 kg 2 kg 5 kg 10 kg |
10 10 10 10 10 |
| 17. |
Tabular Balance: 1 kg 5 kg 10 kg 20 kg 50 kg |
10 10 10 10 10 |
| 18. |
Bathroom Scale: 120 kg and above |
50 |
| 19. |
Baby-cum-Child weighing scale |
20 |
| 20. |
Peg Measure |
|
| |
30 ml. 60 ml. 100 ml. |
20 20 20 |
| 21. |
Electronic Weighing Instrument Medium
and Ordinary Accuracy 400 t. 300 t. 200 t. 150 t. 100 t. 80 t. 60 t. 50 t. 40 t. 30 t. 25 t. 20 t. 15 t. 10 t. 5 t. 3 t. 2 t. 1500 kg. 1000 kg. 500 kg. 300 kg. 250 kg. 200 kg. 150 kg. 100 kg. 50 kg. 30 kg. 25 kg. 20 kg. 15 kg. 10 kg. 5 kg. 3 kg. 2 kg. 1 kg. |
2000 1500 1500 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 250 250 200 200 150 150 150 100 100 100 100 100 100 100 100 50 50 50 50 50 50 50 |
| 500 g. and
below |
50 |
|
| 22. |
Licence Fee Manufacture Repairer Dealer |
500 100 100 |
Annexure-IV
Receipt
of inspection / verification fee (under
No. ________________
Date _______
Received Rs. _____________
(in words _____________________________) in cash from
M/s. ___________________________________on account of fee for verification
and stamping of Weights & Measures as per details given below:
----------------------------------------------------
----------------------------------------------------
----------------------------------------------------
Signature
(Chartered
Engineer)
|
Daily Report |
|
||||||||||||||||||||||||||
| Date_______ Name _______________No._______ Center ____________Camp________ Following sites verified____________ No. of units____________________ No. of units inspected ___________ |
| ||||||||||||||||||||||||||